Cai Qichang fights for another 100 million to replace old water pipes

https://www.zincheng.com.tw/he08.htm

Taichung City ’s Dajia urban water pipe has a plastic pipe with a diameter of 80 to 150 mm, and has been buried for more than 20 years. In addition, various projects such as electricity, telecommunications, and gas have been continuously excavated and repaired and heavy trucks have been rolled for a long time. The water leak was serious. Cai Qichang, deputy president of the Legislative Yuan, sought 100 million yuan to replace the old pipeline. A total of 1,228 households will benefit. It is expected to be completed by the end of December next year. Li Chang praises him as "the great sea line". On the morning of the 2nd, Cai Qichang invited Xiao Shuzhen, the director of the fourth district management office of the water company, Shi Zhichang, a member of Taichung City, and Chen Weiyu, the director of Shuntianli, Zhou Baoxi, the director of Ping'anli, Huang Shengyu, the director of Dajiali, and Shumei Ye, the director of Wenbuli Chief Li Shengyuan, Dajia District Office and other units held a "Demonstration Meeting on Demolition of Pipelines in Jiangjia District and Xinzheng Road in Dajia District" on Xinyi Road in Dajia District. Cai Qichang said that he recently won 50 million yuan in Qingshui and Wuqi Association, and today he also won 100 million yuan to completely replace the old water pipe. On the one hand, in addition to increasing the main pipe, people who do not have tap water can have tap water. Drink, in the second aspect, the old pipeline is enlarged and replaced with new ones, so that the penetration rate of tap water continues to increase, and the local leakage rate continues to decline. Cai Qichang pointed out that if a new user applies for tap water during the construction period, road maintenance expenses can be reduced, and the mile chiefs will be asked to assist Limin in advocating. Xiao Shuzhen said that in order to effectively reduce the water leakage rate in Dajia District, the replacement project in the two cases is expected to replace the old tap water plastic pipes in Xinmeili, Shuntianli, Dajiali and other areas with graphite cast iron water pipes, and 100mm diameter water pipes. 5575 meters and 200mm tap water pipelines are 6914 meters in total, totaling 12.5 kilometers, and the water inlet pipes of users along the line are also exchanged. There are 1228 households, and the project funding is about 102 million yuan. I hope to reduce the water leakage rate, stabilize the water pressure and protect the public. Need for future water consumption growth.

arrow
arrow
    全站熱搜

    happy3684 發表在 痞客邦 留言(0) 人氣()